Global Warming Prevention Technologies
NEWS view all>>
(3/4/2015)

In fiscal 2014 construction was completed on the mobile steel frame and platform (MFP) that carries the entire system for crane pick-up including operable gates and transport lugs. The gas filtration regime design/build process was begun (originally planned for construction at the CETC)   and all key components were positioned on the base frame bringing together the entire prototype as a whole.

... more>>
(3/1/2014)

Together with Fulton Engineered Specialties GWPT completes the first stage of the gas filtration modules and heat exchangers on the MERC 4000 stand-alone micro waste converter in Caledon Ontario. Final engine selection and CPU design is slated for June 2014 with CANMET and 3rd party advisors prior to delivery to CANMET in Ottawa for testing this fall.

... more>>
(2/14/2014)

The owners of the LEED designed home at 53 Hemford Crescent,   have sold the state-of-the-art custom built '2 Spruce House' designed by Steve Poulos of GWPT to a local Toronto family,

... more>>
(12/30/2013)

GWPT completes the structural framework for the MERC 4000

... more>>
(6/9/2013)

GWPT completes the Reference Facility status for the Austrian WTE facility.

... more>>