Global Warming Prevention Technologies

Global Warming Prevention Technologies News

 

05/01/2013

GWPT acquires substantial completion status on the custom LEED home designed by Steve Poulos of GWPT for The City Wide Group consortium: The '2 SPruce House' built in Don Mills at 53 Hemford Crescent stands as a testament to the preservation of the existing natural features of a development site. Displaying over 80 glass windows and doors that look out over the Leaside linear rail park and the secluded streetscape, the modern arts and crafts style home pays tribute to the innovation of the original Don Mills home designs and master planning in the 1950's by Macklin Hancock. 

 

More News


 

(3/4/2015)

In fiscal 2014 construction was completed on the mobile steel frame and platform (MFP) that carries the entire system for crane pick-up including operable gates and transport lugs. The gas filtration regime design/build process was begun (originally planned for construction at the CETC)   and all key components were positioned on the base frame bringing together the entire prototype as a whole.

...
more>>

(3/1/2014)

Together with Fulton Engineered Specialties GWPT completes the first stage of the gas filtration modules and heat exchangers on the MERC 4000 stand-alone micro waste converter in Caledon Ontario. Final engine selection and CPU design is slated for June 2014 with CANMET and 3rd party advisors prior to delivery to CANMET in Ottawa for testing this fall.

...
more>>

(2/14/2014)

The owners of the LEED designed home at 53 Hemford Crescent,   have sold the state-of-the-art custom built '2 Spruce House' designed by Steve Poulos of GWPT to a local Toronto family,

...
more>>

(12/30/2013)

GWPT completes the structural framework for the MERC 4000

...
more>>

(6/9/2013)

GWPT completes the Reference Facility status for the Austrian WTE facility.

...
more>>

(5/1/2013)
GWPT acquires substantial completion status on the custom LEED home designed by Steve Poulos of GWPT ...
more>>

(1/10/2013)

GWPT initiates a Reference Facility agreement with the management of Austrian WTE Facility with the co designer joining up with the GWPT team to procure North American and Eastern European Project Development opportunities.
The Bubbling Fluidized Bed Gasification facility will be optimised with GWPT technology and emission controls.
 
...
more>>

(5/26/2012)
General Shareholder's Meeting...
more>>

(1/25/2012)
GWPT's patented clean-tech waste recycling system have been completed and ready for further assembly and eventual testing at the Canmet Energy and Technology Centre...
more>>

(3/20/2011)
ISO Designation for GWPT...
more>>

(3/1/2011)
Go by Snow...
more>>

(2/15/2011)
How to remove the equivalent of 200,000 cars from the road in CO2 Emissions (all of the cars in Hamilton)...
more>>

(12/2/2010)
 NRC Supports GWPT...
more>>

(8/10/2010)
A second contract has been awarded to Fulton Engineered Specialties inc...
more>>

(6/10/2010)
A Contract was awarded to Greenkite Web Solutions...
more>>

(6/5/2010)
Hewcor International completed the R&D for part ...
more>>

(5/28/2010)
A contract was awarded to Fulton Engineered Specialties inc ...
more>>

(5/15/2010)
A contract was awarded to GWPT to design a ‘LEED for homes’ ...
more>>

(5/5/2010)
A Contract was awarded to Hybrid Motion Control ...
more>>

(11/25/2009)
A patent Assignment Agreement was signed by GWPT...
more>>

(11/7/2009)
GWPT holds its 6th Annual General Meeting at GLOW ...
more>>

(10/15/2009)
The President and CEO of GWPT acquired controlling shares of GWPT Inc...
more>>

(9/16/2009)
A Contract was awarded to Hewcor International to provide R&D ...
more>>

(8/31/2009)
Steve Poulos and John Liu complete 25 Large format AutoCAD ...
more>>

(7/31/2009)
Hybrid Motion Control completed the R&D associated with early design ...
more>>

(6/15/2009)
A submission by Steve Poulos and GWPT was made to the City of Toronto ...
more>>

(5/30/2009)
A contract was awarded to Hybrid Motion Control Inc...
more>>

(5/10/2009)
The CETC at Natural Resources Canada in Ottawa completed the review...
more>>

(3/15/2009)
The Canadian Intellectual Property Office issued the Scrubbing Ionized Rain Tunnel...
more>>

(10/1/2008)
The Canadian Intellectual Property Office announced that it will allow...
more>>

NEWS view all>>
(3/4/2015)

In fiscal 2014 construction was completed on the mobile steel frame and platform (MFP) that carries the entire system for crane pick-up including operable gates and transport lugs. The gas filtration regime design/build process was begun (originally planned for construction at the CETC)   and all key components were positioned on the base frame bringing together the entire prototype as a whole.

... more>>
(3/1/2014)

Together with Fulton Engineered Specialties GWPT completes the first stage of the gas filtration modules and heat exchangers on the MERC 4000 stand-alone micro waste converter in Caledon Ontario. Final engine selection and CPU design is slated for June 2014 with CANMET and 3rd party advisors prior to delivery to CANMET in Ottawa for testing this fall.

... more>>
(2/14/2014)

The owners of the LEED designed home at 53 Hemford Crescent,   have sold the state-of-the-art custom built '2 Spruce House' designed by Steve Poulos of GWPT to a local Toronto family,

... more>>
(12/30/2013)

GWPT completes the structural framework for the MERC 4000

... more>>
(6/9/2013)

GWPT completes the Reference Facility status for the Austrian WTE facility.

... more>>